Leopardo Companies, Inc.
Thinking Green
Join our team
Leopardo Safety Download Brochure

Poplar Creek Crossing

Leopardo was selected by the Archon Group from Dallas, TX to build their new 400,000 square foot Target anchored retail shopping center in Hoffman Estates. Leopardo was brought on early during the project's design phase and worked with the project team to dial in the project cost to meet the owner's budget while maintaining the architectural design and satisfying the building standards established by the village.

  • 42-acre site development included mass excavation and site utility work
  • Ground up construction of this A+ power center included delivering the in-line building and seven outlot buildings totalling 275,000-SF of retail. The buildings were constructed using load bearing masonry with steel roof joists. The faƧade features Atlas brick with prairie stone and eifs cladding. The back wall was constructed with pre-cast concrete panels.
  • From the time vertical construction began, Leopardo utilized multiple sub-contractors in the key trades and project phasing to complete shell construction for the inline and outlot buildings in just over four months
  • Leopardo worked around a 24", 600 psi, natural gas pipeline that ran directly down the middle of the site from north to south. The pipeline, which was just three feet below final grade in some areas, required establishing a 50' demark zone parallel to the pipe to ensure protection of the gas line and job-site safety. Anytime work was conducted inside the zone, a Kinder-Morgan representative was on hand to witness and supervise the activity.
Leopardo always strives for perfection, but I can't think of any single area in which Leopardo's service can be improved. They set the standard on quality for our Minute Clinic program across the country.

Richard Smart, Construction Project Manager
CVS/pharmacy

Click for more testimonials »

Just the other day, the general manager from Donald Trump's building called and asked us who we used on our build-out. I told him Leopardo and I also said I would not hesitate to use them again.

Pete deCastro, Restaurant Partner
Tavern at the Park

Click for more testimonials »

From the bidding and permitting process to the final punch list, your staff was a pleasure to work with. I am completely satisfied with both the quality of work and the timetable in which the job was finished. Even with the condensed schedule, Leopardo completed the job with virtually no punch list!

David Hetzel, Director of Construction
Trader Joe's

Click for more testimonials »

This project has been, in my 17 years of experience, one of the best run operations that I have seen

Kathy Meunier, Property Manager
CB Richard Ellis

Click for more testimonials »

During the 20 plus years that I have been involved with architecture and construction, I have never participated in such a successful "team approach."

Alfred Fiesel, AIA, Associate
Gensler

Click for more testimonials »

Steve Smith, VP
swsmith@leopardo.com
847-783-3300