Juno Lighting - Corporate Headquarters
Des Plaines, Illinois


By slightly altering the geometry and configuration of the build-to-suit corporate headquarters’ precast exterior and fenestration – while maintaining the original spirit of the design intent – Leopardo Construction was able to reduce the cost of the building shell by upwards of a half-million dollars. This, combined with substantial re-engineering of the MEP/FP systems and general construction methods, the project cost was reduced by nearly $8 million to meet the initially established budget.

• 524,000-SF in all

• 100,000-SF of integral two-story office facility

• High-performance glass ribbon windows and a full-height glazed curtain wall at the main entrance