Priority Food Processing
Lake Zurich, Illinois
Leopardo Construction executed the original design/build of this 62,000-SF blending and processing facility for Priority Food Processing. Project highlights include:
Separate processing and blending rooms with a sophisticated exhaust and dust collection system in the blending area
Conference/meeting room with skylights, high-end millwork, remodeled kitchen laboratory
Six openings cut into pre-cast concrete for window installations
Installation of an exterior tower system to meet Priority's stringent process and HVAC requirements
On-site packaging area
Priority engages not only in contract blending of various dry goods but also their own blending of coffees and cappuccinos for the flavors industry. Therefore, special consideration was given to FDA requirements and regulations specific to Priority/Pinnacle Foods operational needs, including an exterior stone ring for repelling insects and rodents